- On-site research on prefabricated housing in Liberia is carried out to identify feasible technologies for prefabricated homes in the country;
- Demonstration and capacity-building activities are held in Monrovia using existing prefab projects; and
- Experience-sharing and workshops for housing officials and technicians are organized in Liberia and China for technical exchanges.
Promoting Affordable Prefabricated Housing in Liberia
March 17, 2019
Challenge
With a fast-growing population and rapid urbanization process, many African countries now face increasing pressure to provide adequate housing for their citizens.
Over the past 10 years since the end of the civil war in Liberia, the country has been vigorously developing its infrastructure, attracting foreign investment, developing production and aiming to achieve long-term peace and stability in order to revitalize the economy and improve livelihoods. As one of the important components in infrastructure construction, the development of civil, commercial and industrial buildings and other projects are essential to improve livelihoods and stimulate economic development. However, the lack of local construction materials and a small manufacturing sector, with only one cement factory in Liberia, have impacted infrastructure development.
Towards a Solution
To address these obstacles and improve the status of Liberian construction, China Africa Business Council (CABC), together with Hengtong Lux Wood, has designed an affordable housing construction scheme. As the implementing unit, Hengtong Lux Wood counts on considerable experience in building materials management and construction. The company also provides one-stop services, including architectural design, building material production, centralized procurement, logistics and transportation, as well as on-site technical training. Given the positioning of low-cost housing in Liberia, Hengtong launched an innovative prefabricated building structure. The main components, such as walls, floor slabs, windows, doors and structures, are prefabricated at the factory. After they are transported to the site, they are assembled quickly, based on drawings. In the CABC-supported programme, Hengtong Lux Wood has promoted prefabricated housing in Liberia in accordance with these three steps: